Abstract: In the process of closed management and construction of chemical industrial park, P+R facility for employee park-and-ride is an important step in the closed management.Based on field research, current situation around the chemical industrial park, road conditions, traffic flow and other influencing factors are analyzed, the parking demand and existing parking lot resources are considered comprehensively, the site selection and layout of interchange parking are performed around the chemical industrial park.Taking Nanjing Jiangbei New Material Technology Park as an example, the planning and design scheme for P+R facilities is proposed, providing a theoretical basis for the construction of P+R facilities in the chemical industrial parks that proceed the closed management.
王加锋, 叶雄广, 匡蓉. 基于P+R的封闭化工园区接驳停车场规划与设计[J]. 现代化工, 2022, 42(S1): 25-28.
WANG Jia-feng, YE Xiong-guang, KUANG Rong. P+R-based planning and design of interchange parking for enclosed chemical industrial parks. Modern Chemical Industry, 2022, 42(S1): 25-28.
[1] Liu H S, Li Y, Li J, et al.Optimizing the location of park-and-ride facilities in suburban and urban areas considering the characteristics of coverage requirements[J].Sustainability, 2022, 14(3):1-21. [2] 杨泽雨.城市型风景名胜区慢行交通设施优化研究[D].南京:东南大学, 2020. [3] 孙学珊, 杨忠振, 魏利鹏, 等.旅游景区停车换乘设施选址优化[J].上海海事大学学报, 2017, 38(1):57-61.